On emergency cooling system inoperable. Alternatively, water

On March 11th 2011 at 2:46 PM an earthquake
with a magnitude of 9.0 struck off of the eastern coastal area of Tohoku, Japan
(TEPCO, 2012). Subsequently a massive tsunami ensued, which reached heights of
up to thirty meters (Kushida, 2012; Baba, 2013) and in its wake left areas
devastated with a total of 20.500 people dead or missing (Ohnishi, 2012) and a
severely damaged infrastructure (Funabashi & Kitazawa, 2012; Figueroa, 2013).
In particular, the Fukushima Prefecture received the heaviest blow where multiple
nuclear power plants were hit. Although most were inoperative due to maintenance,
the Fukushima Daiichi nuclear power station had three active units (Kushida,
2012). The earthquake caused an automatic shutdown of all units, however the
external power lines were also severed (TEPCO, 2012). Despite the successful
reactor shutdown, the cooling pumps required on-site power to function. As a
back-up emergency diesel generators were present, unfortunately the tsunami
breached the defences of the power station and carried away fuel tanks (Anzai
et al., 2011), thus, rendering the emergency cooling system inoperable. Alternatively,
water injection was applied, consequently the combination of steam and core
fuel led to the generation of hydrogen (TEPCO, 2012). Over the next three days,
the three reactors experienced core meltdowns and hydrogen explosions which
destroyed the structure of the buildings and caused the release of radioactive
material into the environment (Funabashi & Kitazawa, 2012; Anzai et al.,
2011).

Analysis

We Will Write a Custom Essay Specifically
For You For Only $13.90/page!


order now

Upon taking a
closer look at the Fukushima nuclear disaster, it becomes evident that
ultimately a sequence of systemic failures played a crucial role in the
deterioration of the Daiichi plant (Kushida, 2012). Therefore, a system
approach rather than a person approach is deemed more appropriate in dissecting
the situation, in which no root cause is assumed and errors are consequences of
complex and systemic factors (Reason, 2000). In addition, by applying the Swiss
cheese model of system accidents a set of latent conditions is revealed
(Reason, 2000), such as the roughly six meters tall defensive walls, which were
easily bypassed by the fifteen meters tall tsunami, and the refusal to
refurbish the plant in 2006 (Hollnagel & Fujita, 2013). Said design
deficiencies fall under latent conditions that create long-lasting weaknesses
(Reason, 2000), and taking into account that the Daiichi power plant had been
designed in the 1960s it is not unreasonable to assume that the buildings which
encompass the nuclear reactors had degraded over the years (Kushida, 2012). Three
general systemic factors can be identified, namely the inability to consider
structural and functional liability (Hollnagel & Fujita, 2013), a lagged
response from an organizational perspective (Pfotenhauer et al., 2012), and
poor risk communication which led to less informed decisions (Figueroa, 2013).

To begin with, in the initial design assessment of the
Daiichi power station the anticipation of major earthquakes was made, however
the initial appraisal cannot be completed because new information can become
available (Hollnagel & Fujita, 2013). For example, in 2004 another nuclear power plant was hit by an earthquake that exceeded its
design basis as some geological faults had been overlooked in the initial review.
Similarly, the 2011 Tohoku earthquake exceeded Daiichi’s design basis, even
though the probability of large earthquakes was known before the actual disaster
(Hollnagel & Fujita, 2013). Furthermore, the structures of the buildings
were essentially forty years old and couldn’t cope with the earthquake (Kushida,
2012). In addition, the retaining walls standing at approximately 5.7 meters
tall were based on the assessment method of  the Japan Society of Civil Engineers dating from
2002 (TEPCO, 2012). In hindsight, the walls should have been higher to withstand
a fifteen meters tall tsunami, however in 2006 recommendations for
refurbishment of the plant were turned down. Since the recommendations were
based on a historical study of a much larger tsunami in the ninth century, the
evidence was not accepted by specialists (Hollnagel & Fujita, 2013).

Regardless, strategies to respond to unexpected severe situations are
as critical as stronger defences (Pfotenhauer et al., 2012). The total loss of
power rendered the cooling systems useless and emergency batteries took over
(TEPCO, 2012), however they merely lasted for eight hours (Ohnishi, 2012). As a
result, TEPCO had to resort to the use of electricity trucks, though the
tsunami had caused a gridlock and only few could make it (Hollnagel &
Fujita, 2013). Concurrently, the government tried flying electricity trucks to
the power plant, but the load was too heavy, indicating that preparations for
transport of such proportions had not been thoroughly investigated (Hollnagel
& Fujita, 2013). Moreover, communication between TEPCO headquarters and plant
personnel was limited as there were no adequate back-up transmitters, and the
chairman was absent until twenty hours after the events, thus further slowing
down the response (Kushida, 2012).

Finally, risk communication failed to help people make more
informed decisions, as risks were initially denied. At 4:54 PM Prime Minister Kan
stated that the Daiichi station was under control, while earlier, the plant
manager had declared a nuclear emergency in progress (Figueroa, 2013). In
addition, the residents had never drilled for evacuation, and the ‘venting’ of
the plant took many hours since the execution of the procedures was unknown to
the personnel. By that point the situation had already exacerbated (Figueroa,
2013).

Conclusion and recommendations for the future

In conclusion, the
disaster was triggered by the earthquake and the tsunami, but essentially was
caused by TEPCO design deficiencies (Baba, 2013). In light of the Swiss cheese
model, it was first the weakened building structures that allowed for damage
from the earthquake, then the inadequate retaining walls that were bypassed by
the tsunami and finally the emergency cooling systems that failed to prevent
hydrogen explosions. Given that other nuclear plants like Daini successfully
avoided damage to the reactors because of available electricity (TEPCO, 2012),
perhaps the most important hindrances to post-measures were lagged operation
related response and poor communication (Hollnagel & Fujita, 2013). For the
future it is strongly recommended that organisations like TEPCO invest into
developing response strategies that prepare for beyond-design-parameter events
(Kushida, 2012). Furthermore, policies should leave room for discussion of standard
and disaster operations, including questioning outdated narratives (Pfotenhauer
et al., 2012). Lastly, organisations should strive for transparency in risk
communication and inclusion of citizens to enhance decision-making in dire
situations, and to assure successful evacuation procedures (Baba, 2013).